
TWO CONTRACTS AWARDED FOR BACKUP GENERATORS FOR BASE SYSTEM
On January 21, two bids were awarded as the last two contracts needed for Lewis & Clark’s Base System. The second backup generator at the Tea Pump Station was awarded to American Electric for $2.47M. The fourth backup generator at the Water Treatment Plant was awarded to Muth Electric for $3.78M.
