High Resolution Photos
Troy Larson, Executive Director
54 inch pipe on SD - Segment 2 & 3A
Water Treatment Plant
One of two 7.5 million gallon reservoirs near Tea
View from inside the 24 inch pipe on MN-3A
Test pumping a well adjacent to the Missouri River
Tea Reservoirs and Pump Station
Tea Pump Station
One of four solids contact basins at the water treatment plant
High Service Pump Station at the Water Treatment Plant
24 inch pipe for MN - Segment 2
54 inch pipe on Raw Water Pipeline - Segment 2
54 inch pipe on Raw Water Pipeline - Segment 3
Lewis & Clark Sign
Sign and Flags at the Water Treatment Plant
Entrance to Water Treatment Plant
16 inch pipe staged for Madison - Segment 1
85th Street Water Tower
54 inch pipe on SD - Segment 7
54 inch pipe on SD - Segment 8
54 inch pipe on SD - Segment 5
Very first pipe installed (30 inch pipe on Raw Water Pipeline - Segment) on June 14, 2004
24 inch pipe for MN - Segment 3A
24 inch pipe for MN - Segment 3A
36 inch pipe for SD - Segment 9
16 inch pipe for Madison - Segment 1
14 inch pipe for Madison - Segment 1
10 inch pipe for Parker service line
16 inch pipe for IA - Segment 1
Crooks Meter Building
16 inch pipe for Magnolia Service Line
\"Pig\" used to clean out the main trunk line between the Tea reservoirs and the treatment plant
Isolation valve vault being constructed on SD - Segment 1
Electrical Switchgear Building at the Water Treatment Plant