High Resolution Photos
Troy Larson, Executive Director
One of four solids contact basins at the water treatment plantDownload Image
Very first pipe installed (30 inch pipe on Raw Water Pipeline - Segment) on June 14, 2004Download Image
\"Pig\" used to clean out the main trunk line between the Tea reservoirs and the treatment plantDownload Image
Isolation valve vault being constructed on SD - Segment 1Download Image
Electrical Switchgear Building at the Water Treatment PlantDownload Image